RFQ: Construction of Livestock Watering Infrastructure and Installation of a Calibrated Water Diversion at Rikolto REQUEST FOR QUOTATION (RFQ) Construction of Livestock Watering Infrastructure at Mwamkulu and Katuma Villages and Installation of a Calibrated Water Diversion and Measurement Structure at Katuma Irrigation Scheme RFQ No.: N°021/EA-RIKOLTO/TANZANIA/CFT/2026 A. Background and Introduction Project Overview and Rationale Rikolto East Africa, through the IKI Katuma Project, “Conservation of Biodiversity in Wetlands through Integrated Water Resources Management,” is implementing interventions aimed at improving water-use efficiency, promoting sustainable livestock management, and contributing to biodiversity conservation within the Katuma Catchment. To promote sustainable water abstraction for irrigation and reduce uncontrolled livestock access to the Katuma River, Rikolto intends to support the installation of a calibrated water diversion and measurement structure at the Katuma Irrigation Scheme and the construction of livestock watering infrastructure in Mwamkulu and Katuma Villages. Purpose of the Quotation Rikolto East Africa invites qualified and experienced contractors, engineering firms, and construction service providers to submit quotations for the construction, supply, installation, testing, commissioning, and handover of the infrastructure described in this RFQ. The procurement is divided into two lots: Lot 1: Installation of a Calibrated Water Diversion and Measurement Structure at Katuma Irrigation Scheme Lot 2: Construction of Livestock Watering Infrastructure at Mwamkulu and Katuma Villages Bidders may submit quotations for one or both lots. Each lot will be evaluated independently. The assignment will be implemented at: Katuma Irrigation Scheme Katuma Village Mwamkulu Village All works are expected to be completed by 1st November 2026. B. Scope of Works The selected contractor shall undertake all necessary activities, including site assessment, supply of materials, construction, installation, testing, calibration, commissioning, and handover of the infrastructure under the relevant lot(s). 1. Lot 1: Installation of Calibrated Water Diversion and Measurement Structure at Katuma Irrigation Scheme Detailed Technical Specifications: Item 1: Calibrated Water Diversion Structure Install a calibrated water diversion structure in a straight and hydraulically stable canal reach with adequate upstream approach conditions. The structure shall be capable of diverting water from the main river to the main canal while accurately quantifying water abstraction. Item 2: Rectangular Broad-Crested Flume (RBC Flume) Design, supply and install a rectangular broad-crested flume incorporating a suitable sharp-crested V-notch measuring section for water measurement and flow regulation. Item 3: Testing and Calibration Carry out testing, calibration and commissioning and provide calibration charts, rating tables and water measurement guidance for operation and monitoring. Item 4: Documentation and Handover Prepare and submit as-built drawings, operation and maintenance guidance, testing and commissioning documentation, and completion and handover reports. 2. Lot 2: Construction of Livestock Watering Infrastructure Detailed Technical Specifications: Item 1: Cattle Trough (Location: Mwamkulu) Construct a reinforced concrete cattle trough with a minimum length of 20 metres, capable of accommodating approximately 600 animals per day. Item 2: Elevated Water Tank (Location: Mwamkulu) Supply and install a 5,000-litre elevated water storage tank complete with supporting tower, fittings, valves and necessary accessories. Item 3: Cattle Trough (Location: Katuma) Construct a reinforced concrete cattle trough with a minimum length of 20 metres, capable of accommodating approximately 600 animals per day. Item 4: Elevated Water Tank (Location: Katuma) Supply and install a 5,000-litre elevated water storage tank complete with supporting tower, fittings, valves and necessary accessories. Item 5: Water Conveyance and Distribution System (Location: Both Sites) Supply and install the necessary pipes, fittings, valves, connections and other accessories required to convey water from the existing water source to the elevated storage tank and cattle trough. Item 6: Testing and Commissioning (Location: Both Sites) Test and commission all facilities and ensure that the complete system is fully functional before handover. Item 7: Site Restoration and Clean-up (Location: Both Sites) Restore affected areas and remove construction waste and excess materials upon completion of the works. The livestock watering infrastructure is intended to provide controlled access to water and reduce the need for livestock to access and drink directly from the river. C. Technical Requirements Lot 1 The bidder shall demonstrate: A minimum of six (6) years of relevant experience in irrigation, water resources or water infrastructure projects. Demonstrated experience in diversion structures, flumes, intakes, canals and water measurement systems. Evidence of at least three (3) similar projects successfully completed within the last five (5) years. Availability of qualified technical personnel and appropriate equipment necessary to undertake the works. Key Personnel: The bidder shall demonstrate the availability of a qualified lead engineer with: A minimum Bachelor’s Degree in Irrigation Engineering, Water Resources Engineering, Civil Engineering or a related field. Relevant experience in irrigation and water infrastructure projects. Demonstrated experience in water diversion and measurement structures. Lot 2 The bidder shall demonstrate: A minimum of three (3) years of relevant experience in livestock watering infrastructure, rural water supply or similar projects. Proven experience in cattle trough construction and water storage infrastructure. Evidence of at least three (3) similar projects completed within the last five (5) years. Availability of suitable qualified personnel, machinery and equipment. Compliance with applicable national construction, occupational health and safety, and environmental requirements. D. Expected Deliverables Lot 1 The successful contractor shall deliver: Installed and calibrated water diversion structure. Functional rectangular broad-crested flume with V-notch measuring section. Calibration charts and rating tables. Water measurement and monitoring guidance. Testing and commissioning report. As-built drawings. Operation and maintenance manual. Completion and handover report. Lot 2 The successful contractor shall deliver: One completed cattle trough at Mwamkulu. One completed cattle trough at Katuma. Two installed and operational 5,000-litre elevated water tanks. Functional water conveyance and distribution systems. Testing and commissioning reports. Site restoration and clean-up. Completion and handover report. E. General Requirements The quotation documentation shall be submitted in English. The bidder shall provide: Technical Proposal. Financial Proposal in Tanzanian Shillings (TZS). Company Profile. Certificate of Incorporation or Business Registration. Valid Business Licence. TIN Certificate. Valid Tax Clearance or Tax Compliance Certificate. VAT Registration Certificate, where applicable. Bank Account Details. CVs of key personnel. Professional registration certificates, where applicable. Evidence of similar assignments undertaken. At least three (3) client references from comparable projects completed within the last five (5) years. F. Submission Instructions Interested and qualified bidders shall submit a complete quotation package comprising the following three (3) separate PDF files: 1. Technical Proposal The Technical Proposal shall include: Understanding of the works. Proposed methodology and implementation approach. Work plan and implementation timeline. Staffing and management arrangements. Relevant company experience and similar assignments. Details of proposed equipment and resources. Health, Safety and Environmental Management Plan. 2. Financial Proposal The Financial Proposal shall be submitted in TZS and shall include: Detailed and itemized Bill of Quantities (BOQ). Labour costs. Material costs. Equipment costs. Transportation and logistics costs. Applicable taxes and other costs necessary for completion of the works. 3. Supporting Documents The bidder shall submit all administrative and supporting documents specified under Section E of this RFQ. Submission Method The three (3) PDF files shall be submitted by email only to: ajirayako@gmail.com The email subject line should clearly indicate the RFQ reference number and the relevant lot/title. Bidders submitting quotations for both lots shall submit separate Technical and Financial Proposals for each lot. Submission Deadline 20th September 2026 at 5:00 PM Tanzania Time Late submissions will not be considered. G. Delivery Period The assignment shall commence immediately after contract signing and shall be completed no later than 1st November 2026. The bidder shall provide a detailed implementation schedule indicating the expected duration for each major activity. H. Evaluation of Quotations Quotations will be evaluated based on: Compliance with administrative requirements. Understanding of the scope of works. Relevant experience and technical capacity. Qualifications and experience of proposed personnel. Technical approach and methodology. Availability of appropriate equipment and resources. Proposed implementation timeline. Financial competitiveness and value for money. Selection Criteria The contract will be awarded to the responsive and compliant bidder demonstrating: Proven experience in similar water infrastructure and/or livestock watering projects. Adequate technical and professional capacity. Quality and suitability of the proposed technical approach. Ability to complete the works within the required timeframe. Competitive and realistic pricing. Best overall
• A minimum of six (6) years of relevant experience in irrigation, water resources or water infrastructure projects. • Demonstrated experience in diversion structures, flumes, intakes, canals and water measurement systems. • Evidence of at least three (3) similar projects successfully completed within the last five (5) years. • Availability of qualified technical personnel and appropriate equipment necessary to undertake the works. • A minimum Bachelor’s Degree in Irrigation Engineering, Water Resources Engineering, Civil Engineering or a related field. • Relevant experience in irrigation and water infrastructure projects. • Demonstrated experience in water diversion and measurement structures. • Technical Proposal. • Financial Proposal in Tanzanian Shillings (TZS). • Company Profile. • Certificate of Incorporation or Business Registration. • Valid Business Licence. • TIN Certificate. • Valid Tax Clearance or Tax Compliance Certificate. • VAT Registration Certificate, where applicable.
Posted
September 18th, 2026
This job listing was sourced by AkiliBrain's automated data pipeline from a publicly accessible employer career page or job board. Listings are indexed daily and verified against the original source. AkiliBrain does not charge employers for listing and does not endorse any specific employer or role.
To apply, use the official link provided by the employer. If you believe this listing contains inaccurate information, please contact our editorial team.
Source: AkiliBrain Jobs & Careers Intelligence — updated daily from employer portals across East Africa.
Company
Rikolto
Location
Tanzania
Deadline
November 1st, 2026
in 25 days